Logo
Sign in
  1. ProKnow Quality Systems
  2. Plan Study Program
  3. Plan Submission FAQs

Plan Submission FAQs

Browse frequently asked questions related to submitting a plan to a plan study.

Follow New articles New articles and comments
  • What are DICOM Detective alerts?
  • Is there a maximum file upload size?
  • How do I submit a composite plan (a sum of multiple plans)?
  • Why is ProKnow reporting metric values that are different from what my software reports?
  • When will the interactive analytics and population stats be posted?
  • Why do you ask for my estimated time to create the plan? How will this be used?
  • Can I submit multiple plans (e.g., using different TPS) to a Plan Study?
  • Do I need to select Remove Uploads button once I submit my final solution to a plan study?
  • When should I select the Remove Uploads button?

© ProKnow Quality Systems